Project profile: CANMET Materials Technology Laboratory

Apr 22, 2015

This 174,300-sq-ft lab and support office space incorporates a complex industrial program of pilot scale casting, rolling, welding, corrosion, and mechanical testing alongside microstructure evaluations and radiation testing. With over 800 customized pieces of equipment in addition to generic lab equipment, CANMET is a complex and energy use intensive building. The pursuit of LEED Platinum triggered a comprehensive Integrated Design Process (IDP), which was pivotal to the resulting design. A building charter targeted significant energy use reduction to exceed the 2030 Challenge and achieve a 70% energy use reduction, a goal that is particularly challenging for an industrial lab building.
(2015 AIA/COTE Top Ten award recipient)

Author: 
AIA Committee on the Environment (COTE)
Published & professionally reviewed by: 
The American Institute of Architects

Community Reviews